Contractor · commercial desk

Own the record. Defend the bill.

Most of what a contractor loses at certification is not disputed work — it is undocumented work. Measurement taken on a phone in a notebook, a variation instructed verbally, an escalation claim assembled six months late. This is the commercial desk that keeps the evidence as the work happens.

Offline first

Measurement, DPR, photos and expenses queue with no signal and sync exactly once

Append-only

A measurement is appended, never overwritten — the sheet an arbitrator reads is the sheet the site wrote

The commercial module set

From the measurement book to the final bill

From the measurement book to the final bill

Measurement & RA bills

Joint measurement recorded on site against the BOQ item, appended to the sheet, carried into the RA bill. Over-claim beyond site-verified quantity is caught before it reaches the certifier.

IPC certification trail

Interim payment certificates with server-derived totals, advance recovery, retention and the full deduction stack — every figure traceable to the measurement that produced it.

Variations & claims

Variation register from instruction to certified value, with the drawing revision or RFI that caused it attached. Delay and EOT evidence assembled as events occur, not reconstructed later.

Escalation, LD & final bill

Price-adjustment workings on the contract formula, liquidated-damages exposure, and a final-bill readiness gate that will not let a closing certificate pass with open blockers.

Subcontracts & procurementPlanned

Back-to-back subcontract packages, purchase orders, stores and material reconciliation — so what you certified downstream and what you claimed upstream reconcile on demand.

Labour, plant & DPR

Daily progress with manpower and plant deployed, feeding earned value and the productivity record that supports a prolongation claim.

Quality, safety & snags

ITPs and hold points, cube-test dues, NCRs, snag lists and safety observations — with the payment interlock that clears an NCR before it clears a bill.

AI estimation agentAI

Bring your own agent for tender build-up and rate analysis. It proposes; the server prices and validates; your estimator imports. Metered per request, draft-only by design.

GST invoicing & expenses

Tax invoices against certified value, receipts and credit notes, site expenses and petty cash with statutory limits enforced, and GSTR-ready exports.

Site CRM: enquiry to contract

Every enquiry with its owner and next dated follow-up; quotations priced by the server from your rate lines, frozen when sent; a won enquiry becomes a project carrying its accepted quotation as the BOQ.

Plant, fleet & equipment ledger

Owned and hired plant with daily hours and fuel on an append-only log; hire bills verified against recorded hours before approval, the variance written on the record and the bill number minted at approve.

Cash flow, P&L & the leak register

Projected margin from contract, cost and commitments — its formula printed on the page — plus a priced register of rupees escaping between the ledgers: hire-bill variances, idle plant, rate inversions, uncollected certificates.

All 13 modules for this desk →

On the roadmap

What the commercial desk gets next

Published so you can plan around it. Nothing below is licensed today, and nothing below is charged for until it ships.

  • →Commitment ledger: budget → PO → actual
  • →Geo-verified site attendance and the wage engine — advances, deductions, BOCW records
  • →Tally & Zoho Books accounting bridge
  • →Role-based site alerts on WhatsApp
  • →Batch production & mix control for RMC and precast yards
  • →Time tracker for staff and subcontract labour
  • →e-Invoice and e-Way bill bridge
  • →AI claim narrative from the delay event register

See it working

The commercial desk, module by module

1 / 14
/ops/projects/[slug]/measurement
Module 01 · Measurement books & RA bills — a screen from the ArgAssure application
Module 01
Measurement books & RA bills
115.23
cum appended this week, sheet preserved
14
RA bills raised to date
0
quantities overwritten — append only
/ops/projects/[slug]/billing
Module 02 · IPC certification trail — a screen from the ArgAssure application
Module 02
IPC certification trail
₹3.05 cr
certified to date, server-derived
100%
certified under four-eyes
₹0
free-text amounts in the ledger
/ops/projects/[slug]/variations
Module 03 · Variations & claims — a screen from the ArgAssure application
Module 03
Variations & claims
37
variations on the register
₹41.8 L
instructed, pending certification
100%
linked to a drawing revision or RFI
/ops/projects/[slug]/escalation
Module 04 · Escalation, LD & final bill — a screen from the ArgAssure application
Module 04
Escalation, LD & final bill
₹22.6 L
price adjustment on the contract formula
₹9.4 L
LD exposure, calculated not guessed
3
open blockers holding the final bill
in development
Planned
Subcontracts & procurement

Planned, not yet built — shown on the roadmap, never as available capability.

Module 05
Roadmap
/ops/field — today
Module 06 · Labour, plant & DPR — a screen from the ArgAssure application
Module 06
Labour, plant & DPR
214
daily reports filed, one per day
offline
queued with no signal, synced once
0.94
earned-value index against baseline
/ops/projects/[slug]/quality
Module 07 · Quality, safety & snags — a screen from the ArgAssure application
Module 07
Quality, safety & snags
97 / A
computed quality audit score
4 sets
cube tests due on 45 cum poured
2
open NCRs interlocking payment
/ops/projects/[slug]/planning
Module 08 · Programme, delay & EOT — a screen from the ArgAssure application
Module 08
Programme, delay & EOT
1,204
activities, critical path computed
locked
baseline immutable once published
31 days
EOT claimed on evidenced events
/ops/settings/agent-tokens
Module 09 · AI estimation for tender build-up — a screen from the ArgAssure application
Module 09
AI estimation for tender build-up
2,478
basic rates the agent may read
draft only
server-priced, reviewer-imported
₹0
money endpoints reachable by the agent
/ops/billing-suite
Module 10 · GST invoicing & expenses — a screen from the ArgAssure application
Module 10
GST invoicing & expenses
₹80,000
unallocated receipt pool
₹35,000
TDS expected vs booked, reconciled
GSTR-1
workbook exported from the ledger
/ops/crm
Module 11 · Site CRM: enquiry to contract — a screen from the ArgAssure application
Module 11
Site CRM: enquiry to contract
₹2.14 cr
quoted from the rate lines, server-priced
frozen
a sent quotation never edits — revisions are versions
0
re-entry from won enquiry to project BOQ
/ops/projects/[slug]/equipment
Module 12 · Plant, fleet & equipment ledger — a screen from the ArgAssure application
Module 12
Plant, fleet & equipment ledger
6.0 h
vendor hours the site never logged — flagged before approval
1 / day
usage log per machine — append-only by grant
four-eyes
the preparer can never approve the hire bill
/ops/projects/[slug]/cashflow
Module 13 · Cash flow, P&L & the leak register — a screen from the ArgAssure application
Module 13
Cash flow, P&L & the leak register
from day one
projected margin: contract − cost − committed, formula printed
5
leak detectors, each priced from its own ledger
0 typed
every figure derives — nothing on the page is entered there
in development
Planned
Commitment ledger & integrations

Budget → PO → actual in one ledger, e-invoice and e-way bill bridge, plant utilisation, and an AI claim narrative from the delay register. Published, not licensed.

Module 11
Roadmap
Not counted in the Contractor Commercial plan and not priced until it ships.

The Contractor runs on Contractor Commercial — ₹4,000 per user, per month.

Minimum 10 seats · billed annually · GST additional · field app included on every seat.

See the planStart the trial

ArgAssure — by AECS Research Global. Engineered in India for Indian construction programmes.