Engineering · QS · estimating
Estimates and certifications that survive the audit para.
For the desk that has to answer a query eighteen months later: every rate sourced, every quantity measured, every certificate reproducible from the record.
What the engineering desk gets
Rate libraries & rate analysis
DSR and DAR masters with component-level analysis, your own firm library alongside them, and a source tag on every rate — [CPWD DSR], [Vendor] or [ARG Recommended].
Estimating ladder & BOQ
Conceptual estimate through NRM elemental plan to measured BOQ, each stage inheriting the last, with the measurement sheet behind every quantity.
Technical specification build-up
Specification authored against the BOQ item and versioned with the tender it was issued in, so award, execution and audit all read the same clause.
AI estimation agentAI
Scoped access to the project's BOQ, resources and programme; instruction packs out, draft proposals back. Server-validated and server-priced, imported only by your own reviewer. Metered per request.
Tenders, award & certification
Tender packages and comparatives, award into contract rates, then RA bill to IPC with four-eyes certification and period locks.
On the roadmap
Roadmap
Published so you can plan around it. Nothing below is licensed today, and nothing below is charged for until it ships.
- Firm-wide rate-library sharing
- spec register versioning
- MEP load and diversity calculators
- IS / NBC code-check assistant
See it working
The estimating desk, module by module





