The Design Office
Communication register
Every letter in and out, referenced and attributable.
- Principal
- Project architect
- Contracts lead

In a practice. When a project turns difficult, the practice that can produce the correspondence trail in an afternoon is in a completely different position from the practice reconstructing it from four inboxes. The register costs nothing while things go well and is decisive when they do not.
What it holds
Auto-referenced correspondence
Every letter takes a gapless practice reference in your own format, with direction, party, subject, the drawing or deliverable it concerns, and the thread it belongs to.
Ball-in-court and follow-ups
Each thread shows who owes the next response and for how long. Reply-due dates raise follow-ups automatically through module 06.
Thread-to-record links
A letter can be tied to a drawing revision, a submission, a cost plan or an invoice — so the correspondence and the artefact it argues about are never separated.
What it will not do
- Send correspondence on your behalf
- Let an inward letter be logged as outward