The Engineering Desk / Module 02

The estimating ladder

Order of cost, elemental plan to NRM, measured BOQ — one lineage rather than three files, with every movement between stages explained.

  • Cost manager
  • Estimator
/ops/projects/[slug]/cost-plans
The estimating ladder — the screen inside ArgAssure

On this desk. The question that ends careers is "why is the tender sum 14% above the approved budget?" It has a good answer or a bad one depending entirely on whether each stage was reconciled to the one before it while the work was fresh.

The stages

Preliminary estimate / order of cost

Functional-unit and area-rate estimating with stated accuracy and exclusions, benchmarked to delivered projects rather than to memory.

NRM elemental cost plan

Elemental development to NRM with allowances, risk and preliminaries carried explicitly — the stage where value engineering can be targeted rather than negotiated.

Measured BOQ

Bill authored on the libraries with measurement sheets behind every quantity, ready to be issued as a tender document with its rate analyses.

Reconciliation between stages

Every difference itemised as design change, quantity refinement, rate movement, scope addition or allowance release — so movement is explained, not defended.

What it produces

  • Issued cost plan per stage, dated and sourced
  • Movement statement between any two stages
  • Tender BOQ with measurement and analysis annexures

What it will not allow

  • A stage that does not reconcile to its predecessor
  • Editing an issued cost plan
  • A quantity with no measurement behind it
Hands over toSpecification (03) · Tenders & award (04) · The Owner's lifecycle cost

← All modules for this deskThe Engineering Desk